
Plandini · Preconstruction, end to end
One tool for the whole preconstruction loop — from the first plan read to the turnover package and kickoff. Every document gets an audible study guide your supers and foremen can listen to on the drive in. Estimators, field leadership, PMs — one source of truth.
All 50
CSI divisions covered
Up to 200 MB
Plan set ingest
MSP XML · PDF · CSV
Schedule export
DOCX · PDF
Proposal output
What Plandini does
Plandini covers every stage of preconstruction — reading the drawings, studying the specs, developing the bid, writing the proposal, closing the job, assembling the turnover package, and kicking the project off to your PM. One product. One source of truth. Same place every estimator on your team works.
01
Read
02
Study
03
Develop
04
Propose
05
Close
06
Turn over
07
Kick off
01 · Read
Drop in the full plan set. Plandini reads every sheet, extracts the equipment schedule, maps trade scope boundaries, and tells you exactly where the drawings and specs disagree — across all 50 CSI divisions, not just one trade.
4,200 LF · matches Sht M-2
Spec mismatch on Sht P-3
23 panels scheduled · E-1
142 EA · zone count short
Structural coord ✓
02 · Develop & Propose
Feed Plandini five or ten of your past proposals. It synthesizes a single unified template, learns your voice and your section order, then writes the next proposal for you — scope, schedule, schedule of values, alternates, and turnover package — formatted exactly the way your company writes them.
Cover
Mechanical & controls retrofit
Project 2847 · First Federal Plaza
Scope
Auto-filled
Schedule
14-week Gantt
SOV
$ broken out
— Furnish and install rooftop equipment per Sht M-1...
— Coordinate with controls contractor per Sequence M-9...
— Provide complete ductwork system as shown on M-2 through M-6...
|drafting next section…
03 · Estimate
The variant extractor reads your intake notes, walks the historical corpus, and finds the three closest comparable projects you have already built. Then it lays in a numbers-down starting bid — labor, equipment, sub costs — so the estimator opens to a draft, not an empty spreadsheet.
14,200 SF · MEP retrofit · 2023
11,800 SF · full reno · 2024
18,400 SF · controls upgrade · 2023
Numbers-down draft
$284,500
Labor
$612,200
Equipment
$148,700
Sub costs
04 · Close & Turn Over
Every document on every job — bids, RFIs, addenda, walk notes, meeting transcripts — sits in one cited corpus you can ask questions of. When the job closes, the turnover package is already assembled, audio-briefed, and ready to hand to your PM at kickoff.
You
What sub did we use for fire sprinkler on the Linde job, and what was the unit price per head?
Plandini
Westport Fire on the Linde Phase II job (2023). Their bid came in at $48.20 per head installed. They were the low of three bids; the other two were Atlas at $54.10 and Northstar at $51.80.
Also included
Scope-of-work generation
Trade-specific narrative drawn from the plans and specs.
RFI management
Voice or text in, formal RFI out, plan references attached.
Vendor quote import
Drop in vendor PDFs — AI parses and matches to line items.
Bond letter requests
DOCX bond letter to your bonding agent in one click.
Phase-by-phase Gantt + MSP
Multi-select, batch indent, MSP XML and PDF exports.
Insurance gap detection
Upload the COI — AI compares against the job spec.
Audible study guide on every doc
Supers and foremen walk a 200-page spec on the drive in.
Shared document library
Every doc the system generates, in one searchable place.
The shift
That is time not spent pricing, not spent on strategy, not spent on the next bid. Plandini gives that time back.
The old way
With Plandini
Early access · limited availability
Your competitors are still reading plan sets by hand. Get on early and see what running preconstruction end-to-end feels like.